O
$100–195K / year · Oak Ridge, Tennessee, US
Oklo designs and deploys liquid metal-cooled fast fission power plants (15-75 MWe) that use recycled nuclear waste as fuel, with passive safety systems that reduce reactor power without human intervention.
1 job